Do you need building consent? A Bay of Plenty homeowner's guide
By Sofia Moreau, Editorial Director · Updated 2026-10-19
Most people ask this question halfway through planning, when a quote already exists. Asking earlier saves money. This guide is general information, not legal advice, and the council is the authority on your specific project.
The short version
In New Zealand, most building work needs building consent, and a list of low-risk jobs does not. That list is Schedule 1 of the Building Act. Exempt does not mean unregulated: the work must still meet the Building Code, and some exemptions come with conditions about size, height or who does the work.
Quick triage
| Project | Usual answer | Why it matters |
|---|---|---|
| New house | Consent needed | Full structural, weathertightness and fire requirements |
| Extension | Consent needed | Changes structure and weathertightness |
| Moving or removing a load-bearing wall | Consent usually needed | Structural |
| New bathroom with plumbing changes | Often needed | Drainage and waterproofing |
| Raised deck | Depends on height | Fall risk, so higher decks are the usual trigger |
| Like-for-like repair | Often exempt | Low risk if nothing changes |
| Painting, flooring, new kitchen cabinets | Generally exempt | No structural or drainage change |
Use the table to prepare questions, not to decide. Details such as height, area, distance from boundaries and plumbing involvement change the answer.
Restricted building work
Some work affects structure, weathertightness or fire safety of a home. That is restricted building work, and a licensed building practitioner must do or supervise it. After finishing, the practitioner gives you and the council a record of work. If a quote does not name the licensed practitioner, ask who it is.

How the process works
- Your designer or builder prepares plans and specifications.
- The application goes to the council, which checks it against the Building Code.
- The council may ask for more information.
- Once granted, work starts and the council inspects at set stages.
- When the work is finished and passes, the council can issue a code compliance certificate.
Keep the certificate. Buyers, lawyers and insurers may ask for it when you sell or claim.
If you are unsure
Contact the council’s building team with a sketch and a description of the job. Many councils will say quickly whether consent is required. If the answer is “it depends”, ask what the condition is and write it down.
Choosing who handles it
You want a builder who tells you early when consent is needed rather than starting work and sorting it later. In the directory’s reviews, communication from quote to finish is among the strongest praise themes, and consent is exactly where that matters. You can look through local builders on the home page and see how scores are built on the methodology page.
Cost and time
Consent fees and processing time vary with the job and the council. Ask your builder for realistic timeframes and make sure the quote states whether consent fees are included. Starting before consent is granted risks having to undo work.
FAQ
- Who decides whether my project needs consent?
- Your local council has the final say. Your builder or designer can advise, but if you are unsure, ask the council before starting.
- What happens if I build without consent when I needed it?
- The council can require you to stop, and you may need to apply for a certificate of acceptance later. That can cost time and money, and it can complicate selling the house.
- Is exempt work free from the Building Code?
- No. Exempt work still has to comply with the Building Code, even though no consent application is needed.
- Does my builder apply for consent?
- Often yes, as part of the job, but agree it in writing so there is no confusion about who is responsible.