Exempt building work (Schedule 1)

Exempt building work (Schedule 1) is building work listed in Schedule 1 of New Zealand's Building Act 2004 that can be carried out without a building consent, provided it meets the conditions set out in the schedule. The exemptions cover minor, low-risk jobs such as some garden structures, minor repairs and certain small plumbing or drainage tasks.

Exempt building work is a category of construction set out in Schedule 1 of the Building Act 2004. It describes work that can be done without applying for a building consent from the local council, such as the Western Bay of Plenty District Council or the Tauranga City Council. The exemption does not mean the work is outside the rules. The building still has to comply with the Building Code, and the work must meet every condition listed against that exemption in the schedule.

Typical examples include some detached garden sheds and small farm buildings below set size limits, retaining walls under a set height, minor repairs and replacements of like-for-like building elements, and some small drainage or plumbing tasks. Each item has its own limits on size, height, distance from boundaries, and location, so a job that looks minor can still fall outside the exemption.

The concept matters because it decides whether a job needs council involvement at all. Work that is exempt avoids the consent fee and inspection process, but the owner remains responsible for compliance. Where a job is not exempt, or the builder is unsure, the usual route is to check with council before work starts. Builders working in the region often handle this check as part of a small job, and you can find providers listed under maintenance and small jobs.

Exemptions are reviewed from time to time, so the wording in the current schedule is the authoritative source. This entry explains the term only and is not legal advice.